City of Los Angeles (BOE, StreetsLA/BSS, LADOT)
In the City of Los Angeles, work in streets and sidewalks involves several departments — the Bureau of Engineering, StreetsLA (Bureau of Street Services), and LADOT — each with a distinct role.
Last reviewed: June 24, 2026
Level: City · Applies to: streets and sidewalks within the City of Los Angeles.
What This Agency Governs
- The Bureau of Engineering (BOE) handles permits for work in the public right-of-way, such as excavation and construction affecting streets and sidewalks.
- StreetsLA (the Bureau of Street Services, BSS) is responsible for the streets and sidewalks themselves, including maintenance and related permits.
- LADOT manages traffic and transportation, including traffic control review and coordination for work that affects travel lanes and traffic operations.
Standards That Apply
- The California MUTCD governs traffic control devices and temporary traffic control.
- City of Los Angeles standard plans, specifications, and permit conditions add the city's specific requirements.
- Cal/OSHA and ADA requirements also apply.
Permits & Authorization
City right-of-way permits (BOE)
Work in city streets and sidewalks generally requires a permit from the Bureau of Engineering. The permit types, application process, and conditions are set by the city and must be confirmed on the official BOE site.
StreetsLA / BSS involvement
StreetsLA is responsible for the streets and sidewalks and may be involved in permits or conditions related to the pavement and sidewalk itself. Confirm the specific role for a given project on the official StreetsLA site.
LADOT traffic control coordination
When work affects travel lanes or traffic operations, LADOT is generally involved in reviewing traffic control. Confirm current traffic control review and coordination requirements on the official LADOT site.
Watch & understand · Public Ready
Why LADOT CTTC Reviews Can Take Time | Public Ready
A City of Los Angeles example of short-term traffic control review, including how workload and coordination can affect the process. Confirm current submission requirements with LADOT.
Verify current requirements: LADOT traffic engineering design plans (opens in a new tab).
From Estimated Review Time Frames. Selecting Play loads YouTube. Use the player’s caption controls when available.
Watch & understand · Public Ready
When a Closure Is Over 72 Hours in Los Angeles | Public Ready
Explore LADOT’s long-term closure review in the City of Los Angeles. Duration, striping changes, and K-rails can affect the applicable review path; confirm the current requirements for the actual scope with LADOT.
Verify current requirements: LADOT traffic engineering design plans (opens in a new tab).
From Estimated Review Time Frames. Selecting Play loads YouTube. Use the player’s caption controls when available.
How to Verify Requirements
- Determine which department applies based on the work: right-of-way permit (BOE), street/sidewalk (StreetsLA/BSS), or traffic operations (LADOT).
- For temporary no-parking postings, LADOT Special Traffic Operations can be reached at (213) 485-2298; confirm the current process and lead time with LADOT.
- StreetsLA permit applications can be started through the online permit portal (bsspermits.lacity.org); confirm the correct permit type on the StreetsLA permits page.
- Confirm current permit types, application requirements, and conditions on each department's official site.
- Confirm device and setup standards against the current California MUTCD and City of Los Angeles standard plans.
Verify Before Relying On Specifics
Official Sources
- LA Bureau of Engineering (eng.lacity.org) — Right-of-way permits.
- StreetsLA / BSS permits — Building materials, earth materials, and related street permits.
- StreetsLA online permit applications — Online permit portal.
- LADOT types of permits — Includes parking/temporary no-parking; Special Traffic Operations (213) 485-2298.
- LADOT (ladot.lacity.org) — Traffic and transportation.
- California MUTCD (Caltrans)