Culver City Work-Zone Compliance
Culver City permits work in the public right-of-way through its Public Works Engineering Division, and temporary traffic control follows the California MUTCD and the city's conditions.
Last reviewed: June 24, 2026
Level: City · Applies to: streets and sidewalks within Culver City (Los Angeles County, Caltrans District 7).
What This Agency Governs
- Work in the Culver City public right-of-way, authorized through the Public Works Engineering Division.
- City standard plans and permit conditions on top of statewide standards.
Standards That Apply
- The California MUTCD governs traffic control devices and temporary traffic control.
- Culver City standard plans and permit conditions add local requirements.
- Cal/OSHA and ADA requirements also apply.
Permits & Authorization
Engineering permit (Public Works Engineering Division)
Work in the city right-of-way is handled through Culver City's Public Works Engineering Division (Engineering Division, (310) 253-5600). The permit types, application steps, fees, hours, and conditions are set by the city and must be confirmed on the official page below.
How to Verify Requirements
- Confirm the road is a Culver City street (not a county road or state highway).
- Confirm current permit types and requirements with the Public Works Engineering Division.
- Confirm device and setup standards against the current California MUTCD.
Verify Before Relying On Specifics
Official Sources
- Culver City — Public Works Engineering Permit — Public Works Engineering Division, (310) 253-5600.
- California MUTCD (Caltrans)