Pasadena Work-Zone Compliance

Pasadena permits work in the public right-of-way through its Public Works department, Engineering & Construction division (Public Works Permitting).

Last reviewed: June 24, 2026

Level: City  ·  Applies to: streets and sidewalks within the City of Pasadena (Los Angeles County, Caltrans District 7).

What This Agency Governs

  • Work in the Pasadena public right-of-way, authorized through Public Works Permitting.
  • City standard plans and permit conditions on top of statewide standards.

Standards That Apply

  • The California MUTCD governs traffic control devices and temporary traffic control.
  • City of Pasadena standard plans and permit conditions add local requirements.
  • Cal/OSHA and ADA requirements also apply.

Permits & Authorization

Public Works permit (Engineering & Construction)

Work in the city right-of-way generally requires a public works permit through Pasadena's Engineering & Construction division. The permit types, application steps, fees, hours, and conditions are set by the city and must be confirmed on the official page below.

How to Verify Requirements

  • Confirm the road is a Pasadena city street (not a county road or state highway).
  • Confirm current permit types and requirements on the Pasadena Public Works Permitting page.
  • Confirm device and setup standards against the current California MUTCD.

Verify Before Relying On Specifics

Official Sources

Related Pages