Expired Permits
Work continues after the permit that authorized it has expired, so the work zone is no longer legally authorized.
Last reviewed: June 24, 2026
What It Looks Like
- Active work in the right-of-way with a permit whose end date has passed, or work continuing past the authorized dates or hours.
Why It Happens
- The work ran longer than planned and no extension was requested, or permit dates were not tracked.
Why It Matters
- Without a valid permit the work is unauthorized — a stop-work risk — and the permit's protective conditions no longer clearly apply.
How It Is Identified
- An inspector or agency checks the permit and finds it expired, or the dates on file have passed.
How It Is Corrected
- Stop work if required, and obtain an extension, renewal, or new permit from the issuing agency before continuing.
How It Can Be Prevented Upstream
- Track permit dates and request extensions or renewals well before expiration; keep the active permit in the field packet.