Exposed Barrier Ends

The end of a concrete or portable barrier faces traffic without a crash cushion or attenuator.

Last reviewed: June 24, 2026

What It Looks Like

  • A blunt barrier end pointed toward oncoming traffic with no crash cushion or attenuator.

Why It Happens

  • The end treatment was omitted, the wrong length of need was assumed, or the treatment was removed.

Why It Matters

  • A blunt exposed end is a severe hazard — an impact there can be far worse than no barrier at all.

How It Is Identified

  • An inspection finds an unprotected barrier end facing traffic.

How It Is Corrected

  • Install the specified crash cushion or attenuator, or flare/bury the end per the standard plan.

How It Can Be Prevented Upstream

  • Determine end treatments during planning from agency standard plans and install them with the barrier.