Inadequate Tapers

A taper is too short or has gaps, so traffic is not moved smoothly out of its normal path.

Last reviewed: June 24, 2026

What It Looks Like

  • A merging or shifting taper that is shorter than required or has large gaps between devices.

Why It Happens

  • The taper was built by eye without the required length, or was shortened to fit available space.

Why It Matters

  • A short or broken taper forces abrupt merges, raising crash and sideswipe risk.

How It Is Identified

  • An inspection measures the taper against the length required for the posted speed in the standard and plan.

How It Is Corrected

  • Rebuild the taper to the required length with continuous device spacing.

How It Can Be Prevented Upstream

  • Take taper length from the standard for the speed during planning and build to it in the field.

Related Pages

Official Sources