Missing Public Notices
Required construction, closure, or parking notices were not posted, or not posted for the required advance period.
Last reviewed: June 24, 2026
What It Looks Like
- A closure or temporary no-parking in effect with no posted notice, or notices posted too late.
Why It Happens
- Notice requirements were overlooked, or postings were not done in advance.
Why It Matters
- People are surprised by closures and towing, generating complaints, disputes, and unsafe reactions; notice is often a permit condition.
How It Is Identified
- An inspection or complaint finds missing or late notices.
How It Is Corrected
- Post the required notices; for parking enforcement, meet the required advance-posting period before towing.
How It Can Be Prevented Upstream
- Plan notices and postings with the required lead time and confirm the agency's requirements.