Preconstruction Readiness and Field Packets

Before the first cone goes out, the crew should have everything they need in hand — the approved plan, active permits, work dates and hours, notices, contacts, and setup diagrams. A field packet is that readiness, assembled.

Last reviewed: June 24, 2026

Why It Matters

  • A crew that arrives without the approved plan, permits, or contacts cannot build a compliant setup or answer an inspector.
  • Readiness assembled in advance prevents the scramble that leads to unapproved work and rejected setups.

When It Applies

  • Before mobilizing any work zone; the packet scales with the size of the work.

Planning Considerations

  • Assemble a field packet: approved plan, active permits and conditions, approved work dates and hours, required notices and postings, contacts, inspection-request procedures, setup diagrams, equipment lists, and emergency procedures.
  • Confirm required notices, postings, and inspection requests are scheduled per the permit.

Field Considerations

  • Keep the field packet on site and current, and use the setup diagram to build the zone to the approved plan.
  • Have contacts and emergency procedures readily available to the crew.

Inspection Considerations

  • Inspectors expect the approved plan, permits, and records to be available on site; readiness makes acceptance faster.

Common Compliance Failures

  • No approved plan or permit on site.
  • Notices or postings not completed before the work.

Upstream Prevention

  • Build the field packet before mobilization and verify it against the permit conditions.
  • Assign someone to keep it current as revisions or extensions occur.