Pedestrian Accessibility Checklist
When work affects a sidewalk or crossing, pedestrians still need a safe, accessible way past the work. This checklist confirms the pedestrian route is continuous, accessible, and clearly signed.
Last reviewed: June 24, 2026
Who it's for: Anyone planning or setting up a work zone that affects a sidewalk, crossing, or transit stop.
0 of 10 checked(0%)
Is a Route Needed?
Route Quality
Signing & Protection
Your progress is saved in this browser only. Nothing is uploaded or downloaded.