What Are Traffic Control Devices?

Traffic control devices are the physical tools used to warn, guide, and protect road users around a work zone. They include cones, barricades, signs, arrow boards, barriers, and more. Each device has a specific purpose, and using the right device in the right place is a core part of work zone compliance.

Last reviewed: June 24, 2026

Part of Traffic Control

Why It Matters

Traffic control devices are how a work zone speaks to drivers and pedestrians. The right device, placed correctly, tells people what is changing and what to do without anyone having to explain it.

Using the wrong device, or placing it poorly, sends a confusing message. Because road users rely on these devices to make quick decisions, correct use is closely tied to safety and to matching the approved plan.

Where It Shows Up in the Field

Traffic control devices appear throughout a work zone, from the first warning sign upstream to the channelizing devices that outline the travel path and the barriers that protect the work area.

In the field, devices are usually combined into a system rather than used alone. A lane closure, for example, might use signs, cones, and an arrow board together so the message is clear from a distance and up close.

Traffic ConeBarricade (Type III)DelineatorArrow BoardChangeable Message SignK-Rail (Barrier)
Common traffic control devices used to warn, guide, and protect road users in a work zone.

Common Traffic Control Devices

The devices below are among the most common in work zones. For each one, it helps to understand what it is, what it does, where it appears, and why correct use matters.

Cones

Cones are lightweight, cone-shaped channelizing devices used to mark temporary travel paths and separate traffic from work. They are easy to place and move, which makes them common for shorter-term setups.

Because cones can be knocked over or shifted by passing traffic, they are checked and reset to keep the path clear and accurate.

Delineators

Delineators are reflective devices, often posts or panels, that mark the edge of a travel path and guide drivers along an alignment. They are especially useful at night or in low visibility.

Delineators help define where the open path is, which supports smooth movement through shifts and tapers.

Barricades (Type I, II, III)

Barricades use horizontal rail panels to warn and guide road users. Type I and Type II are generally smaller and used for warning and channelizing, while Type III is larger and often used to close a road or sidewalk.

The type of barricade chosen depends on how much guidance or closure the situation requires.

Channelizing Devices

Channelizing device is a general term for cones, drums, tubes, and similar devices that guide road users and outline a temporary path. Together they form the visible edges of the route through or around a work zone.

Consistent spacing and placement help these devices read as a clear, continuous line to drivers.

Arrow Boards

An arrow board is a lighted display, usually trailer-mounted, that directs drivers to merge or shift away from a closed lane. It is commonly used for lane closures, especially on higher-speed roads.

The arrow board gives drivers an early, highly visible cue about which way to move.

Changeable Message Signs

A changeable message sign is an electronic sign that can display different messages about closures, detours, or conditions ahead. It is also called a dynamic or variable message sign.

Because the message can be updated, these signs are useful for communicating conditions that change over the course of a project.

Temporary Signs

Temporary signs warn and direct road users specifically for the work zone, such as advance warning of a closure or a detour direction. They are installed for the work and removed afterward.

Their placement upstream of the work gives road users time to read and react before reaching the activity.

K-Rail and Concrete Barriers

K-rail is a common term for portable concrete barriers that physically separate traffic from the work area. They provide a solid barrier where stronger, positive protection is needed.

Concrete barriers are used where the level of risk or the duration of the work calls for more than channelizing devices alone.

Crash Cushions and Attenuators

A crash cushion, also called an attenuator, is designed to absorb energy and slow a vehicle that strikes it. It shields workers and equipment from fixed hazards or the leading edge of a work area.

Attenuators can be fixed in place or mounted on a truck to protect mobile or short-duration operations.

Traffic Control Signs Used in Traffic Control Devices

Browse the exact signs used in this context at MUTCDSignChart.com — California's MUTCD sign reference by Public Ready.

W3-4Be Prepared To StopAdvance warning to be prepared to stop ahead.View Sign at MUTCDSignChart.com →
W9-2Lane EndsWarns that a lane ends and traffic must merge.View Sign at MUTCDSignChart.com →
OM1-3Object Marker (Type 1)Marks an obstruction in or near the roadway (Type 1).View Sign at MUTCDSignChart.com →
OM2-2VObject Marker (Type 2, Vertical)Vertical marker delineating an obstruction (Type 2).View Sign at MUTCDSignChart.com →
OM3-LObject Marker (Type 3)Striped marker for a roadway end or barricade (Type 3).View Sign at MUTCDSignChart.com →

Common Issues or Considerations

A common issue is using a device that does not match what the plan or conditions call for, such as relying on cones where a barrier or barricade is expected. The choice of device should fit the situation.

Maintenance is also important. Devices that are knocked over, dirty, or no longer reflective lose their effectiveness, so they are inspected and corrected while the work continues.

Related Terms

Frequently Asked Questions

What are traffic control devices?

Traffic control devices are the physical tools used to warn, guide, and protect road users around a work zone. They include cones, delineators, barricades, signs, arrow boards, changeable message signs, barriers, and crash cushions.

What is the difference between a cone and a delineator?

A cone is a freestanding, cone-shaped device that marks temporary travel paths. A delineator is usually a reflective post or panel that marks an edge or alignment — often used to guide drivers along a path, especially in low visibility.

When is an arrow board used?

Mainly for lane closures, to tell drivers to merge or shift away from a closed lane. It's especially useful on higher-speed roads, where drivers need an early, highly visible cue about which way to move.

What is a crash cushion?

A crash cushion (or attenuator) is a protective device that absorbs energy and slows a vehicle that hits it. It shields workers and equipment from fixed hazards or the leading edge of a work area.

Where can I learn more about traffic control device standards?

Traffic control device standards trace back to the MUTCD and the version adopted by your state or local agency. The MUTCD Overview and Sources and Standards pages explain how these references generally fit together.

Need project-specific support?

Work Zone Compliance is an educational resource. Public Ready supports traffic control planning, permit readiness, agency coordination, project-specific sign identification, and equipment sourcing through qualified providers across Southern California.

See Public Ready Services