Barrier & Positive-Protection Checklist
Where the risk is high enough, physical barriers separate traffic from workers. This checklist confirms whether positive protection is required and that it is installed as approved.
Last reviewed: June 24, 2026
Who it's for: Planners and field crews installing barriers or positive protection.
0 of 6 checked(0%)
Is Positive Protection Required?
Installation & End Treatments
Your progress is saved in this browser only. Nothing is uploaded or downloaded.